Contact sales@jydultrasonicmachine.com

How to install ultrasonic transducer?
Time:02/14/2023    Views:1  
1. Installation preparation

The manufacturer of high-precision plastic welding machine indicated that all the ultrasonic vibrators to be installed were ready, and the special glue, power cord, ultrasonic cleaner and other objects needed for bonding were placed together.

2. Preparation before sand blasting

The position where the ultrasonic vibrator is installed on the ultrasonic cleaner must be sandblasted to make the surface of stainless steel plate rough, and ensure that the ultrasonic vibrator and the surface of steel plate can be tightly bonded, and the contact side between the ultrasonic vibrator and the steel plate must also be sandblasted.

3. Cleaning after sand blasting

After the sandblasting of the stainless steel plate and the surface of the ultrasonic vibrator is completed, the sand dust on the surface of the ultrasonic vibrator can be wiped off with wood alcohol solution first, and then rinsed with Acetron solution.

4. Dry after cleaning

The cleaned ultrasonic vibrator, stainless steel plate, wire mesh and rubber pad shall be dried with hot air. When the surface temperature of all objects drops to normal temperature, the next bonding work can be carried out.

5. Bonding process

The manufacturer of portable spot welding machine indicated that the surface of stainless steel plate should be wiped dry with Acetron solution.


You Are Deeply interested in related news

Copyright © 2024  Jiayuanda Technology   All Rights Reserved